![Making the Connection in an ATE System](/sites/default/files/styles/max_650x650/public/pickering_-_making_the_connection_in_an_ate_system.png?itok=5bjJ613t)
Webinar
ATE,
Cables
Technical Webinar: The Importance of Signal Routing to Maximize ATE Performance & Reliability
This Webinar presents the various challenges that ATE system engineers face when architecting a cabling and interface system. It also discusses the impact that design decisions have on the overall performance of the test system.
![Making the Connection in an ATE System](/sites/default/files/styles/max_650x650/public/pickering_-_making_the_connection_in_an_ate_system.png?itok=5bjJ613t)
A few of the takeaways are:
- Understand the basic development of a signal routing subsystem that connects the test instrumentation and switching elements to the device under test
- Look into an examination of wiring and connector specifications and how they impact signals of interest, as well as the use of mass interconnect systems in a production environment
- Gain insight from a company with almost 30 years of modular signal switching and simulation experience in electronic test and verification